Archive: Project Mandate — Evidence Recovery Phase (Draft)
The Project Office › Archive › Project Mandate — Evidence Recovery Phase (Draft)
Archived 24 October 2026. Copied from the Legal Wiki (page 3272, page in the WordPress bin, last modified 2026-10-16) before the wiki’s retirement. Kept word for word, except that personal names and contact details are replaced. Current product: see the product set.
Project Mandate — Evidence Recovery Phase
Project: Great House Farm / Tŷ Mawr — Evidence Recovery Phase
Mandate date: 16 October 2026
Executive / Sponsor: Executor of Mary Williams’s estate
Project Manager: Hywel Buckler
Stage: S0 Start-up & Initiation
Next gate: G0, 18 December 2026
1. Background
Great House Farm (Tŷ Mawr), beside St Dochdwy’s Church at Llandough-juxta-Penarth, was the Williams family home. The family’s connection is traced to at least 1667. The central dispute concerns whether Parcel A — the farmhouse, buildings, garden and yard — had a distinct title that was later improperly folded into another registration, with associated questions about missing deeds, 1955 enforcement action, and the 1987 judgment.
This mandate authorises a bounded evidence-recovery phase. It does not authorise litigation, public allegations, or any claim that a threshold has been met. Those steps are reserved to separately triggered projects.
2. Phase objective
Gather all surviving evidence relating to Great House Farm / Tŷ Mawr and leave no stone unturned — meaning every available route for obtaining records and artefacts is exhausted, and every item that cannot be obtained is positively ruled out as destroyed, missing, classified, or lost forever.
3. Scope
In scope:
- Freedom of Information (FOI) and Environmental Information Regulation (EIR) requests to all relevant public bodies
- GDPR / Subject Access Requests (SARs)
- Formal complaints to institutions, with each body given the opportunity to remedy before escalation
- Court applications to compel production or preservation of evidence and artefacts in the possession of restrictive holders
- Catalogue, provenance and verification of all obtained material
- Formal closure logging for every item not obtained
Out of scope (trigger events only):
- Fraud, concealment, or government involvement findings that meet the threshold to reopen a case or report to authorities. Any such discovery triggers a separate parallel project; it does not expand this phase’s scope.
4. Trigger events
Three trigger events sit outside this phase and, if met, launch a new project running in parallel:
- Fraud — evidence identifying a specific person’s deliberate dishonesty that was an operative cause of a material outcome (per Takhar v Gracefield [2019] UKSC 13).
- Concealment — evidence that a relevant fact was intentionally concealed, engaging limitation postponement (per Canada Square v Potter [2023] UKSC 41).
- Government involvement — evidence that a public body acted unlawfully or in breach of duty in a way that is itself actionable or reportable.
A trigger is met only when the evidence crosses the documented threshold. A missing file, a contradiction, or an unverified premise is not a trigger.
5. Approach
Every discovery route is mapped against the policies, procedures and laws of the relevant UK institutions. The phase is bounded: it ends when the closure test is satisfied for every identified item.
6. Closure test
For each surviving record or artefact, the phase records one of:
- Obtained — with catalogue reference, provenance and verification status
- Destroyed — with source and date of that determination
- Missing — with the search trail showing where it should have been
- Classified / withheld — with the exemption or basis cited
- Ruled out — lost forever — with the reasoning documented
No item remains open without one of these five statuses.
7. Tolerances
| Tolerance | Control rule |
|---|---|
| Time | Material external deadlines recorded; missed deadlines trigger an issue entry |
| Scope | New major objectives require a change note |
| Quality | Every published assertion carries a source status |
| Risk | Potential evidence destruction or loss of access escalated immediately |
8. Governance
Controlled under PRINCE2 Project Management Version 7, tailored. See the Compliance & Control Manual, Control Registers, and G0 PID Pack.
PRINCE2 7 outlines: sources · product set · archive